Project Title: Safe Road Connectivity for Tripura State of North region of India.
1. Project Details
Sanction Date: 28-03-2018
Project Category SG
Year 2017-2018
Project Duration 3 Years + 6 Months Extension
BTA : Physical Connectivity
Project Site/ State/ Districts/ Villages Covered: Tripura
Organization/ Implementation Agency: CSIR-Central Road Research Institute (CRRI), Delhi
Project Partners: S.No. Name Role and Responsibilities
1.
National Institute of Technology Agartala Primary Data Collection, Help in arranging Stakeholder meetings and extending all possible technical support
Lead Proponent:

Dr. Mukti Advani

Senior Scientist, Transportation Planning CSIR-Central Road Research Institute (CRRI), Delhi-Mathura Road, New Delhi

Project Brief Description:

Road connectivity in North-East region of India is limited and safety on these roads are challenging due to hilly terrain. In 2015, there were 9291 crashes happened in north-East states resulting in 3106 deaths and 10,152 injuries. Also, during the year 2015, the highest accident severity (road accident deaths per 100 accidents) was reported in one of the North-East states i.e. Mizoram (102.9 per cent).
Road Connectivity and Safety jointly serves the society better and therefore a systematic approach for prioritizing road connectivity and safety improvement is very much essential. It is a key component of overall development of any settlement area (habitat, village and city). Various schemes of government towards improving road connectivity in North-East States are in-place (PMGSY, SHARDP-NE). This project focuses on two aspects of connectivity. First, road network connectivity and second, safety on roads. Focusing on these two aspects, study has been divided into five major tasks covering various activities: (i) reviewing existing data base (maps and data) and preparing an upgraded GIS database covering road network, settlement locations, crash data and census data (ii) assessment of various settlements will be carried out based on the self sufficiency of a settlement area (iii) computing the Road Connectivity Index (RCI) (iv) calculating Road Connectivity Index (RCI) to be further supported by Road Safety Index (RSI) and (v) Overall combined score of RCI which will be able to help in better decision making towards prioritization new construction of roads as well as improvement of existing roads.

Beneficiaries/ Stakeholders:

All stakeholders

Activity Chart (For 3years) Click Here


2. Financial Details
Total Grants (in Rs.) Rs. 46,85,000/- (Rupees Forty Six Lakh Eighty Five Thousand only)


3. Project Objectives, Deliverables and Monitoring Indicators
Project Objectives Quantifiable Deliverables Monitoring Indicators
    • To review existing database with respect road network, settlement locations with demographic details and crash data for the roads within study area;
• GIS-based database for whole Tripura State covering road network, location of settlements along with it´s demographic details and information collected through household survey; • Periodic updates on No. of Baseline surveys and GIS-based Database viz., road network, demographic patterns, household survey information;
• To develop various indices to assess the ease of reaching at various facilities desired by residents within settlement or at nearby major settlements through safe road connectivity. • Priority list for Tripura state for safe road connectivity; • Review Report on Road Network, Ranking of Settlements district wise, ( Nos) etc.;
• A systematic methodology with manual for ranking various settlements (based on socio-economic and demographic characteristics) for assessing existing road connectivity levels and priority work to be carried out for improved connectivity including safety aspects. • Policy drafts/ Recommendations (No.) for assisting the regional decision-making with State-level Priority List on safe road connectivity and networking, Ranking of settlements, etc.;
• Other Publications and knowledge products (Nos.)
S.No. Name Qualification Designation Salary Resigned
1. Subhadip Chakraborty M.Tech JPF 25000/-  
2. Amit Kumar Shaw B.Tech Project Assistant Level -II 25000/-  
3. Vivek Kumar B.Tech Project Assistant Level -II 25000/-  
S.No. Name of Equipment Use of Equipment Cost (in INR)
1. Desktop 69856
2. Printer Canon MF 244DW SN-WQE50840 23899
Website Hits: